Bid Opportunities


Project
Bid Due Date
Contact
Location

Morgan County Courthouse

July 31, 2008  

Kathy Hetrick

 Berkeley Springs, WV

Specifications:

TOC

Table of Contents

Div 01

General Conditions

Div 02

Site Work

Div 03

Concrete

Div 04

Masonry

Div 05

Metals

Div 06

Wood & Plastics

Div 07

Thermal & Moisture Protection

Div 08

Doors & Windows

Div 09

Finishes

Div 10

Specialities

Div 11

Equipment

Div 14

Conveying Systems

Div 15

Mechanical

Div 16

Electrical

Wages

Wage Rates



Addenda:

Addendum1

Addendum #1

A1-0

Arch Plan: A1-0

Addendum2

Addendum #2

Addendum4 Addendum #4
(13 MB takes 10 min)

Addendum #2 Rev. Plans:


001
002
003
004
005

006
007

008


009


010
011

012
013
014
015
016

017
018
019
020
021
022

023
024
025
026
027
028
029
030
031
032
033
034
035
036
037
038
039

040
041
042
043

044
045

046
047
048
049
050
051
052
053
054

055


056
057
058
059
060
061

062
063
064


065
066

067
068

069


070
071
072
073
074

075
076

077

CIVILS:
001    C-1
002    C-2
003    C-3
004    C-4
005    C-5
006    C-6
007    C-7
008    L-1

TRAFFIC PLANS:

009    T-1

ARCHITECTURAL:
010    A2-0
011    A2-1
012    A2-2
013    A2-3
014    A2-4
015    A2-5
016    A2-6 
017    A3-0
018    A3-3 
019    A3-4
020    A4-0
021    A5-0
022    A5-1
023    A5-2
024    A6-1
025    A7-0 
026    A7-1
027    A7-2
028    A7-3
029    A7-5
030    A7-8
031    A7-9
032    A8-0
033    A8-1
034    A8-2
035    A8-2A
036    A8-3
037    A8-4
038    A8-5
039    A8-6
040    A8-7
041    A8-8
042    A8-9 
043    A8-12
044    A9-0 
045    A9-2
046    A9-2A
047    A10-2
048    A10-5
049    A10-8
050    A10-10
051    A11-4
052    A12-1
053    A13-0
054    A13-1
055    A13-4

PLUMBING:
056    P2-0
057    P2-1
058    P2-2
059    P2-3
060    P2-4
061    P3-0
062    P5-0
063    P6-0
064    P6-1

MECHANICAL:
065    M1-0
066    M2-O
067    M2-1
068    M2-4
069    M4-0

ELECTRICAL:
070    E0-1 
071    E2-0
072    E2-2
073    E2-3
074    E3-0
075    E3-2
076    E3-3
077    E4-0



Revised_M3-5

Revised Sheet M3-5


PCO #11 – Electrical Changes:
E3-0  E3-0
E5-5  E5-5
E6-0  E6-0
E7-1  E7-1


Electrical Revised:
Uploaded: 04/03/09
E3-2   E3-2 Revised
E3-3   E3-3
Revised
E6-0-  E6-0 Revised


Electrical Revised:
Uploaded: 04/21/09
E5-5  E5-5
E6-0  E6-0



Drawing Revision
Drawing List
Revised Drawing List
Millwork Revisions
Revised Millwork Drawings
Electrical Drawing Revision
Electrical Drawings
Revised 10/12/09

Plans : 

     General

001
002
001    CVR1  COVERSHEET FOR  VOL 1
002    CVR2  COVERSHEET FOR  VOL 2

    Civil

003
004
005

006
007

008
009
010
011
003    C-1 EXISTING CONDITIONS
004    C-2 DEMOLITION PLAN
005    C-3 SITE PLAN
006    C-4 GRADING PLAN
007    C-5 UTILITY PLAN
008    C-6 LAYOUT PLAN
009    C-7 SITE DETAILS
010    C-8 SITE DETAILS
011    C-9 UTILITY DETAILS

     Landscape

012
013

012    L-1 LANDSCAPE PLAN
013    L-2 LANDSCAPE DETAILS

     Architectural

014
015
016

017
018
019
020
021
022

023
024
025
026
027
028
029
030
031
032
033
034
035
036
037
038
039
040
041
042
043

044
045

046
047
048
049
050
051
052
053
054

055
056
057
058
059
060
061

062
063
064

065
066

067
068
069
070
071
072
073

074
075
076

077
078

079

080
081

082
083
084
085
086
087
088
089

014    A2-0 FIRST FLOOR PLAN
015    A2-1 SECOND FLOOR PLAN -BASE BID
016    A2-2 SECOND FLOOR PLAN ALTERNATE 1
017    A2-4 SECOND FLOOR PLAN ALTERNATE 2
018    A2-4 THIRD FLOOR PLAN
019    A2-5 WALL TYPES
020    A2-6 WALL TYPES
021    A3-0 FIRST FLOOR REFLECTED CEILING PLAN
022    A3-1 SECOND FLOOR REFLECTED CEILING PLAN-BASE BID
023    A3-2 SECOND FLOOR REF. CLG. PLAN -ALT 1
024    A3-3 SECOND FLOOR REF. CLG .PLAN -ALT2
025    A3-4 THIRD FLOOR REFLECTIVE CEILING PLAN
026    A4-0 ROOF PLAN
027    A5-0 BUILDING ELEVATIONS
028    A5-1 BUILDING ELEVATIONS
029    A5-2 BUILDING ELEVATIONS
030    A6-0 BUILDING SECTIONS
031    A6-1 BUILDING SECTIONS
032    A6-2 BUILDING SECTIONS
033    A7-0  WALL SECTIONS
034    A7-1 WALL SECTIONS
035    A7-2 WALL SECTIONS
036    A7.3 WALL SECTIONS
037    A7-4 WALL SECTIONS
038    A7-5 WALL SECTIONS
039    A7-8 WALL SECTIONS
040    A7-7 WALL SECTIONS
041    A7-S WALL SECTIONS
042    A7-0 WALL SECTIONS
043    A8-0 DETAILS
044    A8-1 DETAILS
045    A8-2 DETAILS
046    A8-2A DETAILS
047    A8-3 DETAILS
048    A8-4 DETAILS
049    A8-5 DETAILS
050    A8-8 DETAILS
051    A8-7 DETAILS
052    A8-8 NAILS
053    A8-9  DETAILS
054    A8-10  DETAILS
055    A8-12 DETAILS
056    A9-0  DOOR SCHEDULE / DETAILS
057    A9-1 DOOR & WINDOW DETAILS
058    A9-2 DOOR & WINDOW DETAILS
059    A9-2A DOOR AND WINDOW ELEVATIONS
060    A9-3 WINDOW ELEV. / DETAILS
061    A10-0 TOILET ENLARGEMENTS
062    A10-1 TOILET ENLARGEMENTS
063    A10.2 FIRST FLOOR ENLARGEMENTS
064    A10-3 FIRST FLOOR ENLARGEMENTS
065    A10-4 FIRST FLOOR ENLARGEMENTS
066    A10-4A FIRST FLOOR ENLARGEMENTS
067    A10-5 SECOND FLOOR ENLARGEMENT
068    A10-6 FAMILY COURT ENLARGEMENTS
069    A10-6A FAMILY COURT ENLARGEMENTS
070    A10-7  MAGISTRATE COURT ENLARGEMENTS
071    A10-7A MAGISTRATE COURT ENLARGEMENTS
072    A10-8 THIRD COURT ENLARGEMENTS
073    A10-9 CIRCUIT COURT ENLARGEMENTS
074    A10-9A CIRCUIT COURT ENLARGEMENTS
075    A10-9B  CIRCUIT COURT ENLARGEMENTS
076    A10-10 MISCELLANEOUS ENLARGEMENTS
077    A11-0 FIRST FLOOR ACCESS CONTROL PLAN
078    A11-1 SECOND FLOOR ACCESS CONTROL PLAN- BASE BID
079    A11-2 SECOND FLOOR ACCESS CONTROL PLAN
080    A11-3 SECOND FLOOR ACCESS CONTROL PLAN
081    A11-4 THIRD FLOOR ACCESS CONTROL PLAN
082    A12-0 CASEWORK DETAILS
083    A12-1 CASEWORK DETAILS
084    A12-2 CASEWORK DETAILS
085    A13-0 STAIR ENLARGEMENTS
086    A13-1 STAIR SEC11ONS
087    A13-2 STAIR SECTIONS
088    A13-3 RAMP SECTIONS
089    A13-4 STAIR 8 RAMP ELEVATIONS

     Structural

090
091
092
093
094
095
096
097
098

090    S1-0 GENERAL NOTES & SCHEDULES
091    S2-0 FOUNDATION PLAN
092    S2-1 SECOND FLOOR FRAMING PLAN
093    S2-2 THIRD FLOOR FRAMING PLAN
094    S2-3 ROOF FLOOR FRAMING PLAN
095    S3-0 SECTIONS AND DETAILS
096    S3-1 SECTIONS AND DETAILS
097    S3-2 SECTIONS AND DETAILS
098    S3-3 SECTIONS AND DETAILS

    Fire Protection

099
100
101
102
103
104

099    F1-0 GENERAL NOTES, DETAILS & SYMBOL LEGEND
100    F2-0 FIRST FLOOR PLAN- FIRE PROTECTION
101    F2-1 SECOND FLOOR PLAN (BASE BID)-FIRE PROTECTION
102    F2-2 ALT1 SECOND FLOOR PLAN (ALTERNATE 1)-FIRE PROTECTION
103    F2-3 ALT2 SECOND FLOOR PLAN (ALTERNATE 2)-FIRE PROTECTION
104    F2-4 THIRD FLOOR PLAN-FIRE PROTECTION

    Plumbing

105
106
107
108
109
110
111
112
113
114
115
116
117

118
119
120

105    P1-0 PLUMBING GENERAL NOTES AND SYMBOL LEGEND
106    P2-0 WASTE-FIRST FLOOR PLAN-PLUMBING
107    P2-1 WASTE-SECOND FLOOR PLAN (BASE BID)-PLUMBING
108    P2-2 ALT1 WASTE-SECOND FLOOR PLAN (ALTERNATE 1)-PLUMBING
109    P2-3 AL T2 WASTE-SECOND FLOOR PLAN (ALTERNATE 2)-PLUMBING
110    P2-4 WASTE-THIRD FLOOR PLAN-PLUMBING
111    P2-5 ROOF PLAN-PLUMBING
112    P3-0 PIPING-FIRST FLOOR PLAN-PLUMBING
113    P3-1 PIPING-SECOND FLOOR PLAN (BASE BID)-PLUMBING
114    P3-2 ALT1 PIPING-SECOND FLOOR PLAN (ALTERNATE 1)-PLUMBING
115    P3-3 AL T2 PIPING-SECOND FLOOR PLAN (ALTERNATE 2)-PLUMBING
116    P3-4 PIPING-THIRD FLOOR PLAN-PLUMBING
117    P4-0 PLUMBING DETAILS
118    P5-0 PLUMBING SCHEDULES
119    P6-0 SANITARY ISOMETRIC PART A
120    P6-1 SANITARY ISOMETRIC PART B

    Mechanical

121
122
123
124

125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

121    M1-0 HVAC GENERAL NOTES AND SYMBOL LEGEND
122    M2-O DUCTWORK- FIRST FLOOR PLAN -HVAC
123    M2-1 DUCTWORK-SECOND FLOOR PLAN (BASE BID) -HVAC
124    M2-2 ALT1 DUCTWORK-SECOND FLOOR PLAN (ALTERNATE 1)-HVAC
125    M2-3 ALT2 DUCTWORK-SECOND FLOOR PLAN(ALTERNATE 2)-HVAC
126    M2-4 DUCTWORK-THIRD FLOOR PLAN -HVAC
127    M3-O PIPING- FIRST FLOOR PLAN -HVAC
128    M3-1 PIPING- SECOND FLOOR PLAN (BASE BID) -HVAC
129    M3-2 ALT1 PIPING -SECOND FLOOR PLAN (ALTERNATE 1)-HVAC
130    M3-3 ALT2 PIPING -SECOND FLOOR PLAN (ALTERNATE 2)-HVAC
131    M3-4 PIPING- THIRD FLOOR PLAN -HVAC
132    M3-5 ROOF PLAN-HVAC
133    M4-0 MECHANICAL ROOM PLANS -HVAC
134    M5-0  FLOW DIAGRAM
135    M6-0 HVAC SCHEDULES
136    M6-1 HVAC SCHEDULES
137    M7-0 HVAC DETAILS
138    M7-1 HVAC DETAILS
139    M8-0 TEMPERATURE CONTROLS
140    M8-1 TEMPERATURE CONTROLS

    Electrical

141
142
143
144
145
146
147
148
149
150
151
152
153
154

155
156
157
158
159
160
161
162
163
164

165
166
167
168


141    E0-0 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
142    E0-1  LIGHTING FIXTURE SCHEDULE
143    E1-0 DEMOLITION- SITE PLAN-ELECTRICAL
144    E1-1 NEW WORK- SITE PLAN-ELECTRICAL
145    E2-O LIGHTING- FIRST FLOOR PLAN-ELECTRICAL
146    E2-1 BASE-LIGHTING- SECOND FLOOR PLAN-ELECTRICAL
147    E2-2 ALT.1-LIGHTING - SECOND FLOOR PLAN-ELECTRICAL
148    E23 LIGHTING- THIRD FLOOR PLAN-ELECTRICAL
149    E3-O POWER- FIRST FLOOR PLAN-ELECTRICAL
150    E3-1 BASE-POWER- SECOND FLOOR PLAN-ELECTRICAL
151    E3-2 ALT.1-POWER - SECOND FLOOR PLAN-ELECTRICAL
152    E3-3 POWER- THIRD FLOOR PLAN-ELECTRICAL
153    E3-4 CUPOLA PLANS ELECTRICAL
154    E4-0 SYSTEMS- FIRST FLOOR PLAN-ELECTRICAL
155    E4-1 BASE-SYSTEMS- SECOND FLOOR PLAN-ELECTRICAL
156    E4-2 ALT.1-SYSTEMS - SECOND FLOOR PLAN-ELECTRICAL
157    E4-3 SYSTEMS- THIRD FLOOR PLAN-ELECTRICAL
158    E5-0 MECHANICAL EQUIPMENT -FIRST FLOOR PLAN -ELECTRICAL
159    E5-1 BASE- MECH EQUIPMENT- 2ND FLOOR PLAN-ELECTRICAL
160    E5-2 ALT.1-MECH  EQUIPMENT -2ND FLOOR PLAN -ELECTRICAL
161    E5-3 MECHANICAL EQUIPMENT- THIRD FLOOR PLAN-ELECTRICAL
162    E5-4 MECHANICAL EQUIPMENT- ROOF PLAN-ELECTRICAL
163    E5-5 MECHANICAL EQUIPMENT SCHEDULE AND NOTES
164    E6-0  ONE LINE DIAGRAM, SCHEDULES, AND NOTES
165    E7-0 ELECTRICAL DETAILS
166    E7-1 ELECTRICAL DETAILS
167    E7-2 ELECTRICAL DETAILS
168    E7-3 ELECTRICAL DETAILS

                                                     

Copyright © 1999-2000, Milestone Construction Services, Inc. All rights reserved.
21495 Ridgetop Circle, Suite 300 Sterling, VA 20166-6512 tel 703.406.0960 - fax 703.406.0964
mcsi@MilestoneConstruction.com - www.MilestoneConstruction.com