Bid Opportunities


Project
Bid Due Date
Contact
Location

IAD Toilet Room Renovation Main Terminal

December 28, 2009
noon

Lindsay Round 

 Dulles, VA


Specifications:

TOC
Table of Contents
Division 0 Contracting Requirements
Division 1
General Requirements
Division 2
Existing Conditions
Division 5
Metals
Division 6
Wood, Plastics and Composites
Division 7
Thermal and Moisture Protection
Division 8
Openings
Division 9
Finishes
Division 10
Specialties
Division 12
Furnishings
Division 21
File Supression
Division 22
Plumbing
Division 23 HVAC
Division 26 Electrical


Addenda:







Plans :

    Cover
Cover
Title Sheet
    General
General
General Drawings
     Architectural
Architectural
Archiectural Drawings
     Fire Protection
Fire_Protection
Fire Protection
    Plumbing
Plumbing
Plumbing Drawings
     Mechanical
Mechanical
Mechanical Drawings
    Electrical
Electrical
Electrical Drawings
     
                                        

 

Copyright © 1999-2000, Milestone Construction Services, Inc. All rights reserved.
21495 Ridgetop Circle, Suite 300 Sterling, VA 20166-6512 tel 703.406.0960 - fax 703.406.0964
mcsi@MilestoneConstruction.com - www.MilestoneConstruction.com